The following steps represent the chronological order for project design with ETS. Carry out the ETS settings.Read in or convert product catalogs.Create the project with the necessary data.Set up the structure of the project (building structure/bus topology).Insert KNX products (devices with corresponding application) into the building structure.Set the parameters of the KNX products according to…
4.7 – Project design with ETS: General principles